LINER REPLACEMENT •

Pool Liner Replacement in

Empire Pools installs premium vinyl liners for pools — precision measuring, sub-base touch-ups, bead-track inspection, and wrinkle-free vac set. We plan each replacement around local traffic and staging points near Sunrise Highway (NY-27), Merrick Road (CR 27), Wantagh Avenue, and Jerusalem Avenue to keep delivery, access, and hoses clean and predictable on install day. If you’re close to the corridor leading to Wantagh State Parkway or heading south toward Jones Beach State Park, we can typically coordinate scheduling and staging fast to keep the liner protected during set and fill.

Every liner job starts with detail work that most companies rush: we verify wall height, radiuses, hopper/deep-end geometry, and step/bench dimensions so the factory build matches your pool—not a “close enough” template. Before the liner goes in, we inspect the bead receiver, coping, and track for brittleness or gaps that can cause the liner to pop out later, and we flag anything that should be corrected while the pool is empty. On install day we prep the floor so it’s smooth underfoot (patching divots and low spots, addressing vermiculite or base wear where needed), then we use a controlled vac set and staged fill pace to pull the liner evenly into corners and seams. If conditions change—wind picks up, leaves start dropping, or access is tight—we adjust our staging (hose routes, equipment placement, debris control) so the liner stays clean during the most important part of the job: the first few inches of water and final alignment before cut-ins.

• Local Insight

Tuned for South Shore wind + highway corridor access

Wantagh installs can see quick gusts and debris shifts—especially when conditions change around open corridors. We stage equipment and manage fill pace so the liner sets smooth.

From blocks near Merrick Road (CR 27) to routes off Wantagh Avenue, Jerusalem Avenue, and Beltagh Avenue, we plan delivery, access, and hose routes to protect landscaping and speed the install.

What’s Included

  • On-site measure (length/width/depths), wall height, and corner radii verification.
  • Bead track inspection; replace brittle lock-in as needed (quoted on site).
  • Sub-base touch-ups: floor trowel/patch, divot and wrinkle prevention.
  • Liner hang and dual vac set for tight fit prior to filling.
  • Cut-ins after water passes threshold: main drains, returns, lights, and skimmer.
  • Hardware refresh (gaskets/faceplates/screws) as required by condition.
  • Haul-away of old liner (available; quoted by weight/condition).
  • Fill guidance to protect seams and prevent liner float; chemistry start-up.
  • Note: Structural repairs, wall foam, vermiculite/base rebuild, and plumbing repairs are quoted if observed.

Why Choose Empire Pools

  • expertise — manage wind, access, and fast weather swings during vac set.
  • Wrinkle-free process with staged fill, seam alignment, and photo documentation.
  • Transparent options: pattern choices, wall foam, step gaskets, and hardware refresh.
  • Coordination for water delivery or hydrant permits when required (town rules vary).
  • Clear scope & pricing before we begin — no surprises.
  • Post-install check-in to confirm fit, fill progress, and chemistry balance.
Starting at $2,800 + tax

Local Reviews

★★★★★

“We’re right off Wantagh Avenue and needed a clean, wrinkle-free set. The liner fit is perfect and the seams are dead straight.” — K. B.,

★★★★★

“They caught a worn bead track section before install and fixed it so the liner wouldn’t pop out later. Really thorough.” — M. R.,

★★★★★

“Great communication and photo updates. Cut-ins were clean and everything stayed smooth through the fill.” — T. S.,

★★★★★

“They fixed a couple low spots in the base while the pool was empty. The floor feels brand new.” — A. D.,

★★★★★

“From measuring to install day, everything was organized. No wrinkles, no loose corners, and no surprises.” — J. P.,

Liner Replacement — FAQs

Do you replace pool liners throughout , NY?
Yes — we cover and nearby Nassau County areas. We schedule measurement first, then coordinate manufacturing and install timing.
How long does a liner replacement usually take in ?
Once the liner is on site, most installs are completed in a day. Fill time depends on water source and hose flow; we’ll guide the pace to protect seams and prevent float.
Can you fix bead-track or coping issues while the pool is empty?
Yes. We inspect the bead receiver/track during measurement and again on install day. If anything is brittle, cracked, or loose, we quote the fix before we proceed.
What if my pool has steps, benches, or a custom deep end?
That’s exactly why we measure carefully. Steps, benches, and hopper geometry are included so the factory build fits your pool precisely (not a generic template).
What can delay an install in ?
The most common delays are water logistics (source/flow), unexpected base repairs once the old liner is out, and weather/wind on install day. We plan staging and timing to reduce risk.
What helps you quote faster?
Pool shape, approximate dimensions, wall height, step/bench details, and a few photos (wide pool shot + equipment pad + bead track close-up) help us price accurately.